Case Studies

| Project: | Industry |
| Overview: | Bord Gais commissioned a Gama Power Systems/GE (General Electric) consortium to design and build a 445MW combined cycle gas turbine (CCGT) power plant on a site adjacent to the ConocoPhilips Refinery in Whitegate, Co. Cork at an estimated cost of €400m. The commercial operation of the power plant is expected to commence on July 2010. |
| Client Profile: | APC (Atlantic Projects Company) is one of Irelands’ and the worlds’ most experienced erectors of heavy-duty industrial gas and steam turbines, installing more than 250 large gas and steam turbines totaling in excess of 25,000MW, at power plants, petro-chemical and industrial facilities worldwide. The company has an outstanding world-wide reputation as capable of achieving exacting standards. |
| Survey Requirements: | Project surveyors for Mechanical and E&I installation of Centerline of IPP 450MW Combined Cycle Power Plant. |
| Surveys Carried Out: |
|
| Key Points: | Murphy Surveys have received glowing recommendations from Senior Site Personnel in relation to our work on this project. In particular, our ability to deliver and backup accurate results in order for key equipment to be verified to project engineers and EPC in a professional and timely format. Our consistency throughout the duration of the project and degree of accuracy has gained the respect of those on site. Murphy Surveys understand the large responsibility that comes with our job especially when delivering critical measurements on such important infrastructural projects. We strive for excellence in all aspects of our work and this has been apparent on this project. |
Should you require additional case studies or case studies relevant to your project, please speak to our marketing department on + 353 45 484040